Utilities > Scheduling > Scheduling > The most common causes of scheduling failure

1.4 The most common causes of scheduling failure

If a schedule does not run correctly, check the possible causes listed in the following table and apply the corresponding solution.
 
Cause Solution
The Cloud Server is being updated Make sure that the Cloud Server is switched on or switched off.
The DBaaS is being modified Wait for the operation to complete (for example, a change to the storage or other configurations) and check that the next scheduled operation runs correctly.
The Cloud Server has been deleted Delete the schedule, as it is no longer associated with an existing Cloud Server.
The database has been deleted Delete the schedule, as it is no longer associated with an existing database.
The Cloud Server was already in the
state specified by the schedule
Make sure that the Cloud Server status is consistent with the schedule: if you schedule it to switch off at regular intervals, remember to also schedule it to switch on.
You set a recurrence that has already expired Make sure that the schedule falls between the start date and end date.
For example, if you set the start date to the 1st of the month and the end date to the 15th, a schedule set for the 20th will not run.
Insufficient credit Make sure that you have sufficient credit to keep the service active and allow the scheduled operation to run.